Snagging, properly
A snagging list is every defect, unfinished item and poor finish found at the end of the works, agreed with the builder and signed off one by one. On a large villa, it can run to many pages. It needs a methodical walk-round in good light, every door and window opened, every tap and switch tried, and the terraces watered to see where the rain will go.
The papers that matter
- Manuals and warranties for every appliance, pump, air-conditioning unit and system
- Certificates for electrics, gas and any installations that need them
- Paint colours, tile references and spare tiles kept for future repairs
- Drawings showing where pipes and cables actually run
We collect and file all of it in your house file, so the next repair does not start with guesswork.
The first season
New buildings settle, new seals are tested by their first storm, and new systems show their faults in their first summer. We watch for this closely in the first months and send anything covered back to the builder under guarantee. It is the final stage of our renovation oversight.
How we can help
This is part of our renovation oversight service. Your project, watched over while you are abroad. We are happy to look at your own villa; arrange a consultation or send us a message.
